Project experience

Selected engineering project experience.

Examples of machine design and assessment, with the engineering role and outputs described for each project.

New machine design

Linear stacker

Structural and mechanical assessment during design development

Project phase: design development

Linear stacker structural analysis model
Structural analysis model of the linear stacker and tripper during design development.

The engineering challenge

Developing a new linear stacker required the boom, counterweight, luffing system, travelling equipment and tripper to be assessed together. Changes to load assumptions or machine balance could improve one condition while increasing demand elsewhere.

ACE’s responsibility

ACE supported the manufacturer and project delivery team through structural and mechanical calculations, whole machine assessments and an AS 4324.1:2025 gap study.

Engineering assessment

The work examined stability and wheel reactions across the assessed loading conditions, together with luff cylinder forces, long travel requirements and buffer loads. Sensitivity studies investigated how retained material and counterweight affected machine behaviour. Structural assessments identified members, support arrangements and interfaces requiring further design attention.

AS 4324.1:2025 gap study

ACE reviewed the earlier technical requirements against AS 4324.1:2025 and identified design basis clarifications, recommended technical specification changes and further assessment needs.

The review distinguished changes associated with the new edition from existing requirements and gaps in supporting information. The resulting register identified required inputs and actions across connected disciplines, supporting coordination of the OEM’s detailed design.

Recommendations for detailed design

ACE compared design options and recommended actions for the OEM’s detailed design. The assessment showed how machine balance and mechanical forces affected the structure, travel equipment, wheel assemblies and tripper.

The project team received recommendations and an action register to coordinate the remaining engineering work. Design and verification items needing further work were recorded for the next project stages.

Explore new machine design support ↗

Anthony Nguyen’s project experience

Corroded bucketwheel assessment

Technical examples

See the engineering reasoning.

These educational examples explain the assessment approach. They are separate from ACE’s client project record.

Drive mass and machine balance

A heavier drive changes the boom moment. Adjusting counterweight can restore cylinder force while centre link and support loads remain changed.

Read the worked example

Recurring connection cracks

Review the crack location, operating duty, repair history and load path before selecting strengthening or repair details.

Read about repairs and stiffness

Machine modifications and access

Compare drive arrangements with their supporting structure, services, maintenance access and installation requirements.

Read the drive selection example

Experience behind the work

Technical leadership.

Anthony’s career spans OEM design teams and operating mine and port environments. Read about his professional background and technical leadership on the About page.

About Anthony and ACE ↗

Start a conversation

Need help with a machine design, upgrade or repair?

Contact ACE with a brief description of your machine, the work you are planning or the problem you need to resolve, and your required timing. We will review the available information and discuss the structural or mechanical engineering support required.

Discuss your project