
Why fatigue cracks return after repair
Compare the intended repair with the installed detail, investigate the loading and establish what the next repair needs to address.
Read articleEngineering resources
Practical resources for OEM, project, maintenance and asset engineers working with stackers, reclaimers and shiploaders.
Technical Insights
Choose a topic or search the articles. No registration is needed.
17 insights shown

Compare the intended repair with the installed detail, investigate the loading and establish what the next repair needs to address.
Read article
Connect cracking, corrosion and inspection gaps to operating decisions, repair priorities and the next inspection.
Read article
When replacement is delayed, reassess the service required from the existing machine and the time available for inspection and repair.
Read article
Follow load paths, required movement and the installation sequence before adding, altering or removing steel.
Read article
Check how changed hours, cutting duty, speed and machine movements affect fatigue demand and the existing assessment.
Read article
Assess the existing machine, connected equipment and infrastructure against the proposed duty before committing to an upgrade.
Read article
Check test conditions and machine changes before adjusting counterweight. Follow the effects through linkage forces, support loads and stability.
Read article
Rebalancing after a heavier drive upgrade can restore cylinder force while the centre link and supporting structure carry higher loads.
Read article
Compare complete drive arrangements, including supports, services and access. A lower equipment price may transfer costs elsewhere.
Read article
Plan jacking locations, temporary supports and restraints around the load path at each stage of a bearing replacement.
Read article
Assess cylinder forces, support after failure and the connected effects of changes to balance, structure and controls.
Read article
Connect operating duty, loads, interfaces and maintenance requirements to the evidence needed at each design release.
Read article
Resolve transport, assembly and fabrication decisions before dependent work is released, then verify accepted changes.
Read article
Identify what can proceed to procurement, what needs further evidence and which supplier interfaces remain unresolved.
Read article
Check the machine, rails, foundations and supporting infrastructure together before fixing the design or upgrade scope.
Read article
Assess mass location, counterweight, fatigue and fabrication requirements before treating a lighter design as a saving.
Read article
Understand the configuration, requirements and assessment scope behind a compliance result before relying on it.
Read articleTry a different word or browse all topics.
Assessing ACE’s capabilities?
Read the reference projects and professional experience, or download the capability statement directly.
View reference projects ↗Keep learning
Register your interest in future engineering articles and occasional workshop invitations.
Start a conversation
Contact ACE about the machine, proposed work or observed damage, and your required timing. We will discuss the engineering support required.